To avoid vapourisation, pipe lines are laid over the ridge so that these are above the hydraulic gradient line, not more than« Back to Previous Page
A. 2.4 m
B. 6.4 m
C. 10.0 m
D. 5.0 m.
|
▲ ▼ |
B. |
Please log in to post questions/answers: