PERT analysis is based on« Back to Previous Page

A. optimistic time B. pessimistic time C. most likely time D. all the above.
Posted by Civil Engineer
Asked on August 31, 2016 12:51 pm
0

D. all the above

Posted by Civil Engineer
Answered on August 31, 2016 12:52 pm
0

D. all the above

Posted by Civil Engineer
Answered on August 31, 2016 12:52 pm
0

D. all the above

Posted by Civil Engineer
Answered on August 31, 2016 12:52 pm