The time which results in the leasi, possible construction cost of an activity, is known« Back to Previous Page
|
A. normal time
B. slow time
C. crash time
D. standard time.
|
| ▲ ▼ |
B. slow time |
| ▲ ▼ |
B. slow time |
| ▲ ▼ |
B. slow time |