The toe projection of foundation slabs is taken« Back to Previous Page

A. as one third of the base B. as one sixth of overall height of the wall C. equal to heel slab D. below ground surface.
Posted by Civil Engineer
Asked on August 19, 2016 12:47 pm
0

A. as one third of the base

Posted by Civil Engineer
Answered on August 19, 2016 12:47 pm
0

A. as one third of the base

Posted by Civil Engineer
Answered on August 19, 2016 12:47 pm