The toe projection of foundation slabs is taken« Back to Previous Page
A. as one third of the base
B. as one sixth of overall height of the wall
C. equal to heel slab
D. below ground surface.
|
▲ ▼ |
A. as one third of the base |
▲ ▼ |
A. as one third of the base |
Please log in to post questions/answers: