The toe projection of foundation slabs is taken« Back to Previous Page
|
A. as one third of the base
B. as one sixth of overall height of the wall
C. equal to heel slab
D. below ground surface.
|
| ▲ ▼ |
A. as one third of the base |
| ▲ ▼ |
A. as one third of the base |
Please log in to post questions/answers: