The distances AC and BC are measured from two fixed points A and B whose distance AB is known. The point C is plotted by intersection. This method is generally adopted in« Back to Questions List

chain surveying

Posted by Civil Engineer
Asked on June 17, 2016 3:07 pm
1

chain surveying

Posted by Civil Engineer
Answered On June 26, 2016 4:41 am