In "full face" method of constructing tunnel, the first operation relates to« Back to Questions List

A. removal to bottom portion B. excavation of one drift in the centre C. removal of top portion D. excavation being done along the perimeter
Posted by Civil Engineer
Asked on October 4, 2016 12:03 pm
0

C. removal of top portion