To design a cross-over between parallel tracks, the required components are :« Back to Previous Page

A. two switch, points, two acute angle crossings and two check rails B. two switch points, two acute angle crossings and four check rails C. two switch points, two acute angle crossings and six check rails D. none of these.
Posted by Civil Engineer
Asked on August 24, 2016 1:31 pm
0

B. two switch points, two acute angle crossings and four check rails

Posted by Civil Engineer
Answered on August 24, 2016 1:33 pm
0

B. two switch points, two acute angle crossings and four check rails

Posted by Civil Engineer
Answered on August 24, 2016 1:33 pm