A clay layer 3 m deep is sandwiched by a pervious material. The soil reaches 90% consolidation in 3 years. At another site, the same clay layer is bounded by impervious boundary at the bottom and sand at the top. What is the time taken by this layer to reach 90% settlement ?« Back to Previous Page
|
A. 9 years
B. 12 years
C. 15 years
D. 21 years
|
| ▲ ▼ |
B. 12 years |
| ▲ ▼ |
B. 12 years |
Please log in to post questions/answers: