Finally formed berms in canals are provided for« Back to Previous Page

A. protection of banks erosion by the waves B. control of seepage losses C. strengthening of banks D. all the above.
Posted by Civil Engineer
Asked on August 23, 2016 1:48 pm
0

D. all the above.

Posted by Civil Engineer
Answered on August 23, 2016 1:48 pm