A mild steel flat subjected to a tensile force of 84 tonnes is connected to a gusset plate using rivets. If the forces required to shear a single rivet, to crush the rivet and to tear the plate per pitch length are 5000 kg, 8000 kg and 6000 kg respectively, then the number of rivets required is« Back to Previous Page
A. 12
B. 14
C. 16
D. 17
|
▲ ▼ |
D. 17 |
▲ ▼ |
D. 17 |
Please log in to post questions/answers: